Office Alteration & Fit Out - Central London

Our client had recently taken possession of various areas within an office in Central London. To optimise the space, an extensive programme of alteration and fit out works were undertaken by Interspace Ltd.

Alteration works were carried out to provide breakout areas for staff. Following an extensive programme of stripping out existing meeting rooms and other areas, a number of new plasterboard partitions were installed to various areas. The partitions ultimately provided our client with meeting rooms, quiet rooms and breakout areas.

To compliment the plasterboard partitions, we installed frameless glass partitions, complete with glass and timber veneer doors to suit our clients’ requirements.

New plumbing and electrical installations have been installed to suit the new layouts necessary to suit the proposed tea point installation.

New tea points have been installed, using modern grey, matt finish units with timber worktops, complete with stainless steel sink and chrome mixer tap.

To complete the tea point, a ceramic tiled splashback has been provided along with a full range of appliances, all integrated within the tea points.

The tea point area has been finished off with a LVT vinyl tile floor to compliment theunits and surrounding finishes. This has been laid over the existing raised access floor.

PROJECT TYPE: FIT OUT/OFFICE ALTERATIONS
LOCATION: LONDON
DURATION: 20 WEEKS
SERVICES PROVIDED: STRIPPING OUT, OFFICE ALTERATIONS, PLASTERBOARD PARTITIONS, FRAMELESS GLASS PARTITIONS, MANIFEST, DECORATIONS, PLUMBING, ELECTRICAL, SUSPENDED CEILINGS JOINERY, DOORS, ALUMINIUM FRAMES, TEA POINTS, LVT, VINYL FLOORING, FITTING OUT